July 2025 Maintenance
Due to the ongoing renovation work in the Department of Economics, power to the cluster will be cut from July 8 to July 12. To minimize the impact, we will carry out our biannual maintenance during that period of time.
Beyond the usual software updates, we will carry out the following major upgrades:
- Upgrade login-1 and the control node to Ubuntu 22.04.
- Bring online a new 800TB archive storage node.
- Install two new 512-core AMD EPYC Zen 4c compute nodes.